Install 2 Versions of Primavera P6 On the Same PC – NEW In Version 18
I used to think installing 2 different versions of Primavera P6 Professional on the same PC was impossible. Well, impossible…
I used to think installing 2 different versions of Primavera P6 Professional on the same PC was impossible. Well, impossible…
The internet is a great place when looking to broaden your horizons, but the amount of content that is being…
“Please proceed with the changes.” That familiar phrase used by many but not written or documented properly can cause major…
I had a very simple question posed to me in the Plan Academy Member’s Community area recently about auditing P6’s…
As-built drawings are required in almost every project and it is a common practice for future reference. Recording as-built and…
Integrated Project Delivery is a thoughtful process designed to enhance productivity, reduce costs and increase collaboration through all design and…
Contractors use many different types of contracts but predominantly lump sum and unit price type of contracts. However, I have…
As you move forward in your career, there usually comes a time when the question’s “am I happy or am…
Cost is one of the triple constraints in project management and one of the most important of every project. While…
How many times have you looked into buying or renting a tool or equipment? Still figuring out if there is…
Bidding mistakes and critical errors are the most common issues when reviewing proposals and bids. Estimators and project managers spend…
There is so much to go through and learn about construction, but it doesn’t always have to be concepts and…
Construction insurances are one of the most important topics every construction professional needs to understand. There are many alternatives and…
Greenfield engineering or greenfield construction is the process of developing a new building or structure over a piece of land…
The other day I spoke with a scheduler friend of mine by phone to see how his construction project was…